One of the most essential tools in project management is a Work Breakdown Structure, or WBS. The primary function of a WBS is to subdivide a project into more manageable components in terms of size, duration, and responsibility. By breaking a project down into smaller pieces it’s also easier to:
In short, the Work Breakdown Structure defines how you estimate, manage, and bill the project — and as a result, creating one should be priority one for every project.
2. Be mutually exclusive. There should be no overlap between two elements of a WBS in scope definition. Such an overlap could not only result in duplicated work or misunderstanding about responsibility and/or authority, but could also cause confusion in project cost accounting. One technique for avoiding this problem is to develop a WBS dictionary to clarify the differences between WBS elements and describe each in terms of milestones, deliverables, activities, scope, and other factors.
3. Focus on outcomes, not actions. The best way to stick to the 100% rule is to define Work Breakdown Structure elements in terms of outcomes, as opposed to actions. This strategy ensures that the WBS is not overly prescriptive in terms of method, and therefore allows for more flexibility and creative thinking on the part of team members. In addition, a WBS that subdivides work by project phases (e.g. preliminary design phase, critical design phase, etc.) must clearly separate the phases by deliverables that define the entry and exit criteria (e.g. an approved preliminary or critical design review).
4. Be detailed, but not too detailed. As useful as it is to divide work into smaller and more manageable elements, you also need to know when to stop. There are several ‘rules of thumb’ for determining appropriate activities or group of activities needed to produce a specific deliverable as defined by the WBS. The first is the “80 hour rule,” which cautions that no one activity or group of activities to produce a single deliverable should require more than 80 hours of effort. A second guideline is that no single activity or series of activities should take longer to complete than a reporting period. So, if your project team reports on its progress monthly, then no single activity or series of activities should be longer than one month long.
5. Keep it simple. Creating three levels in your WBS hierarchy (e.g., Project, Phase and Task) should be enough. Avoid identifying labor or activity codes as WBS elements, even if you use them to describe labor detail on billing invoices or backup reports. In addition, it’s not necessary to make every phase balanced; just because one phase has a task doesn’t mean that all should.
When finished, a well-organized WBS resembles a flowchart in which every element is logically connected to another. The primary requirement or objective appears at the top, with increasingly specific elements appearing beneath it. The elements at the bottom of the diagram represent tasks and activities small enough to be easily understood and carried out. An effective WBS avoids redundancy, but at the same time, leaves out no critical elements.
The bottom line is that a Work Breakdown Structure divides your project into distinct, manageable work elements. A WBS is useful to various groups within a company, including marketing, business development, accounting, and project management. A well-planned WBS is integral to successful project proposals, planning, scheduling, budgeting, and reporting.
Ready to learn more? Discover how an ERP system can benefit your firm by downloading our whitepaper.
Photo credit: http://virtualpminabox.com/